TL;DR

The East Santa Clara Senior housing development by Eden Housing is now underway. The 68-unit building at 700 East Saint John Street serves households between 30 and 60 percent of area median income, with 20 units of permanent supportive housing for seniors exiting homelessness. The mix is 67 restricted one-bedrooms plus a two-bedroom manager's unit.

Total development cost runs about $783,000 per unit.1 San José's construction-permanent loan is $6.8 million, or $100,000 per unit: 12.8 percent of the total. For a project with this depth of affordability, that is a relatively small local contribution, explained by three project-specific details below.

The capital stack

First, HUD awarded Eden a $5.9 million capital advance under the Section 202 Supportive Housing for the Elderly program, non-repayable as long as the units serve low-income seniors for 40 years, plus a Project Rental Assistance Contract on the 43 units at 50 percent AMI. New capital advance funding largely stopped for most of the 2010s and resumed in 2019 at modest levels: recent national rounds have run $115 to $175 million, enough to fund only a few dozen projects nationwide.2 When one lands, the advance substitutes for local soft debt, and the PRAC's contract income converts into a permanent financing source.

Second, rental assistance: the Santa Clara County Housing Authority committed 20 project-based vouchers for the 30 percent AMI supportive homes, and between those and the PRAC, 63 of 67 restricted units carry a subsidy contract. That contract income supports the $9.9 million permanent financing source, covering operating costs for the 30–60 percent AMI units.

Third, the land: the County of Santa Clara owns the site and is ground-leasing it to Eden, a contribution the CTCAC sources table carries at over $4.0 million in donated value, alongside a separate $8.3 million County commitment in Measure A and Local Housing Trust funds and roughly $1.0 million in waived fees.

The CTCAC and City of San José sources tables also record the Bay Area Housing Innovation Fund playing the bridge role it was designed for. At CTCAC application in September 2025, BAHIF held nearly $18 million across three positions: the $9.9 million tax-exempt permanent note, a $6.8 million soft loan, and a $1.3 million mezzanine piece. By the February 2026 loan commitment, only the mezzanine remained.3 A private lender stepped into the permanent note, and the City's award assumed the soft position. Those positions let Eden show CTCAC a fully financed stack; the takeouts then returned $16.7 million to BAHIF for its next deal.

The City's $6.8 million is that soft-loan takeout, approved by the City Council on February 24, 2026 as the first award from the Housing Department's June 2025 NOFA round: $5 million from the Measure E extremely-low-income allocation and $1.8 million from the Low and Moderate Income Housing Asset Fund.

The rest of the stack is conventional. In December 2025, CTCAC awarded $2.5 million in annual 9 percent federal credits off the waiting list, generating roughly $21.1 million in equity at the project's $0.84 credit factor. Per Eden's construction-start announcement, Hudson Housing Capital is the investor and Capital One is providing construction debt.

One accounting note. The $783,000 per unit is the true-cash cost. CTCAC's staff report shows $856,000 gross, the difference being roughly $5 million in donated County land and waived fees. Both figures are legitimate; they answer different questions. Gross is what senior housing costs to produce in San José. True cash is what somebody had to fund.

The site

The building sits on 0.76 acres of the 12-acre East Santa Clara Master Plan, the former County medical office site between 14th and 17th Streets planned for over 550 homes, 320,000 square feet of office, and ground-floor retail. Two other residential pieces are moving in parallel: the Housing Authority's own 64-unit senior building, Trillium, and Core Companies' 36 affordable for-sale townhomes. The historic Building 800 - the 1919 Temple Laundry structure - will serve as a shared amenity center with a communal kitchen and food distribution program.

Entitlement was ministerial: the project cleared CEQA under Government Code §65913.4 (SB 35), now the standard path for 100 percent affordable projects on public land here. The County executed the ground lease in May, construction financing closed, and the schedule calls for roughly 18 months of construction - lease-up in early 2028.

Three starts, one cost basis

East Santa Clara Senior is one of three fully affordable projects covered on this blog so far in 2026, alongside Trimble Apartments - The Pacific Companies' 136-unit phase of Coyote Creek Village - and Affirmed Housing's RISE at Berryessa. While the development costs cluster within about five percent of each other, the financing structures are significantly different.

  East Santa Clara Senior Trimble Apartments RISE / Berryessa
Developer Eden Housing The Pacific Companies Affirmed Housing
Units 68 136 195
Product Senior, all 1BR Family, 1–3BR Large Family, studio–3BR
Affordability 30–60% AMI, 20 PSH 30–70% AMI, Average Income 30–60% AMI, PSH units
Credit type 9% ($2.5M annual) 4% + $31M bonds 4% + bonds
Total development cost $58.2M $115.9M $175.0M
Per unit $856,458 $851,879 $897,528
Local soft debt $15.1M (City + County) None City, County, BAHAF, AHSC
Rental assistance 63 of 67 units None 49 County PBVs
Construction window Aug 2026 – early 2028 May 2026 – May 2028 May 2026 – May 2028

Figures are gross total development costs drawn from each project's state staff report, City staff report, or proforma; final amounts may differ as projects close and complete cost certification.4

Three observations from the table.

Cost is nearly the constant; the funder is the variable. The same roughly $850–900k per unit gets paid for three different ways. Trimble closes with no local soft debt at all: the Average Income election puts its largest tier at 70 percent AMI, and those higher rents carry enough bond debt to fill the gap. East Santa Clara Senior keeps the local share to $15.1 million because federal sources - the Section 202 capital advance, the PRAC, the vouchers - do the heavy lifting. RISE, with the deepest affordability applied to family-sized units and no 202 in sight, runs 76 percent subsidy across four public soft loans. Affordability depth is what determines the public position.

East Santa Clara Senior's $856,000 per unit buys one-bedroom senior apartments; Trimble's near-identical $852,000 buys a family mix that is more than half two- and three-bedrooms. On a per-square-foot basis the senior building is the more expensive product - CTCAC carries its construction cost at $677 per square foot - which is what small floorplates, an elevator-served building, and supportive services space do to the math. Per-unit comparisons across product types flatter the family projects.

For many 100 percent affordable projects, developers don't buy land at all. East Santa Clara Senior sits on a County ground lease. RISE sits on a VTA ground lease. Trimble's parcel arrives as an $8.6 million donated land value inside its masterplan. Across all three, land and acquisition costs fall within a narrow $59,000–63,000 per unit band, reflecting predevelopment and lease execution rather than purchase price. In 2026 San José, many fully affordable developments run on land someone else already paid for.

Takeaway

Not every element here is replicable. Section 202 awards are rare, waiting-list 9 percent credits are not guaranteed, and free public land doesn't scale. Sequencing is the part of the capital stack a developer actually controls. What transfers well is the order of operations: Eden had site control, ministerial entitlements, and a federal rent subsidy in hand before requesting local gap funds, with bridge capital holding the stack together in between.

Frequently asked questions

Project overview and timeline

What is the East Santa Clara Senior housing development in San José?

East Santa Clara Senior is a 68-unit affordable senior apartment development located at 700 East Saint John Street in San José, California. Developed by Eden Housing, the project serves households earning 30% to 60% of Area Median Income (AMI), including 20 units of permanent supportive housing for seniors exiting homelessness. It sits on a County of Santa Clara ground lease inside the 12-acre East Santa Clara Master Plan.

When will construction on East Santa Clara Senior be completed?

Lease-up is expected in early 2028. Construction began in August 2026 and is scheduled to run roughly 18 months, following the County's execution of the ground lease in May 2026 and the closing of construction financing.

What features and amenities are included in the development?

The development consists of 67 restricted one-bedroom apartments and one two-bedroom manager's unit on 0.76 acres. Residents will share amenities with the broader East Santa Clara Master Plan, including the historic 1919 Temple Laundry structure (Building 800), which becomes a shared amenity center with a communal kitchen and food distribution program.

Financing and city subsidy

How much does the East Santa Clara Senior project cost to build?

The project's true cash development cost is approximately $783,000 per unit. Its gross development cost is $856,458 per unit, or $58.2 million in total; the difference between the two figures is roughly $5 million in donated County land value and waived fees. Gross cost is what senior housing costs to produce in San José; true cash cost is what somebody had to fund.

How did San José keep its municipal subsidy to only $100,000 per unit?

San José limited its contribution to $6.8 million, which is 12.8% of true cash development cost, by combining three specialized sources:

The City's loan was approved by Council on February 24, 2026, drawing $5 million from the Measure E extremely-low-income allocation and $1.8 million from the Low and Moderate Income Housing Asset Fund.

What is the HUD Section 202 program, and how does it support this project?

The HUD Section 202 Supportive Housing for the Elderly program provides capital advances to finance affordable senior housing. For this project, HUD awarded a non-repayable $5.9 million capital advance alongside a Project Rental Assistance Contract (PRAC) on the 43 units at 50% AMI. The award directly replaced local soft debt and provided contract revenue to support permanent loan financing. New capital advance funding largely stopped for most of the 2010s and resumed in 2019 at modest levels, so awards remain rare.

Planning, policy, and replicability

How was the East Santa Clara Senior project entitled?

The project achieved ministerial entitlement under California Senate Bill 35 (SB 35 / Government Code §65913.4). This streamlined path exempts qualifying 100% affordable housing developments from CEQA environmental review, and it is now the standard entitlement path for fully affordable projects on public land in San José.

Can other affordable housing developers replicate this financing structure?

Only the sequencing is easily replicable. HUD Section 202 awards are rare, waiting-list 9% tax credits are not guaranteed, and free public land does not scale. What transfers is the order of operations: Eden Housing reduced its local funding request by securing site control, ministerial entitlements, and federal rent subsidies before applying for local soft debt, using bridge financing from the Bay Area Housing Innovation Fund (BAHIF) to hold the stack together in between.

Notes on figures and sources

Several figures here are calculated, derived, or drawn from documents produced at different stages of the financing. For transparency:

  1. Two cost bases. The $783,000 per unit is true cash cost - total development cost net of donated land and waived fees. The $856,458 gross figure follows the CTCAC staff report for CA-25-110. The comparison table uses gross figures throughout so the three projects are measured on the same basis.
  2. Section 202 round sizes reflect recent national funding rounds and are given as context for how rare an award is, not as figures specific to this project. Eden's $5.9 million capital advance and the PRAC on 43 units follow the CTCAC sources table.
  3. The BAHIF positions changed between documents. The three-position structure is what appears in the September 2025 CTCAC application; the single remaining mezzanine piece is what appears at the February 2026 City loan commitment. Both are accurate as of their date, and the difference is the takeout, not a correction.
  4. Comparison figures are application-stage. Each project's total development cost comes from its own state or City staff report or proforma, and all three remain subject to final cost certification at placed-in-service. Per-unit figures are total development cost divided by total unit count, including manager's units.
  5. Per-unit and percentage calculations - $100,000 per unit, the $59,000–63,000 land-and-acquisition band - are my arithmetic off the reported totals, and round to the figures shown. The City's 12.8 percent share is measured against true cash development cost; against the $58.2 million gross figure the same $6.8 million is 11.7 percent.

Sources

Questions or corrections? Reach me at kostya@kostya.io or LinkedIn.

Related Articles

RISE / Berryessa TOD: Eleven Sources Behind a 195-Unit Affordable Tower
Coyote Creek Village: What's Being Built at Montague and Seely
Beyond Zoning: Why 22,000 Entitled Homes Are Waiting
Building Through the Storm: San José's Counter-Cyclical Housing Push

Konstantin Voronin

Konstantin is a Housing Planning and Policy Administrator for the City of San José, with prior experience in real estate development and proptech. He writes from the intersection of housing policy, development economics, and real estate technology in the Bay Area.

Disclaimer: The views and analysis expressed in this article are entirely my own and do not reflect the official policy or position of the City of San José.