What do the Flatiron Building in NYC and the Bank of Italy Building in DTSJ have in common?
Both are early 1900s office landmarks converting to residential. The Flatiron (1903) is selling 3-bedroom condos starting at $11 million. The Bank of Italy (1926), San José’s first skyscraper is working toward City approvals for at least 100 apartment units.
These aren't coincidences. These buildings share the physical DNA that makes conversion feasible: narrow floorplates that give every unit windows, high ceilings that accommodate new mechanical systems, and operable windows that meet light-and-air codes without expensive facade modifications.
But most office buildings don't have these traits. And no amount of policy incentive, from zoning adjustments to fee waivers, can overcome bad geometry.
TL;DR: Office-to-Residential Conversion Feasibility
- Physical form is decisive: Only 25–30% of office buildings are physically convertible—typically pre-1990 towers with narrow floor plates and operable windows.
- The financial gap persists: Office valuations haven't fallen enough to meet residential land value, and conversion costs run higher than expected.
- Policy helps at the margin: Fee relief, parking flexibility, and expedited review move near-feasible projects—but can't fix bad geometry.
Why Most Buildings Fail the Test
What determines office-to-residential conversion feasibility? The physical and economic feasibility of converting an office building into residential housing is primarily dictated by floor plate geometry. Buildings constructed before 1990 with narrow floor plates, operable windows, and central elevator cores are highly convertible because they allow for adequate natural light. Conversely, modern deep-plate office buildings often require financially prohibitive structural modifications (like coring light wells) to meet residential building codes.
San José's 2025 Cost of Development Study dedicates an entire chapter to office-to-residential conversions. The conclusion is stark: only a narrow subset of buildings can feasibly support this type of adaptive reuse.
Gensler, which has assessed over 1,300 potential conversion projects across 130+ cities, finds similar results nationally. Their data reveals that only 25-30% of buildings analyzed are physically suitable for conversion. And of those, only about 5% are actually moving forward, as the gap between physical viability and financial feasibility remains wide.
All the features that make a building an unpleasant office make for an excellent residential product. A 12-foot floor-to-floor height feels cramped for modern office expectations (yielding roughly 8.5-foot ceilings after ducts and drop ceilings). But remove the office infrastructure, expose the ceiling, and you can achieve 11-foot residential ceilings, a genuine luxury in multifamily housing, where 8 to 9 feet is standard.
Physical Determinants: The Decisive Factors
Before financial feasibility is even tested, a building's physical form determines whether conversion is technically achievable. The Cost of Development Study identifies four critical attributes.
The Physical Screening Test
Attributes that make or break a conversion
Shallow Floorplates
40-60 foot depth allows natural light and window exposure for nearly all residential units.
Deep Center-Core
Creates large, windowless interior zones unsuitable for habitable space without costly carve-outs.
High Ceilings (11-14 ft)
Accommodates modern plumbing, electrical, and ducting required for residences.
Low Ceilings
Makes it difficult to fit new residential mechanical, electrical, and plumbing systems.
Punched/Operable Windows
Provides natural ventilation and easily meets light-and-air standards.
Curtain-Wall Facade
Expensive to modify and typically lacks operable openings for ventilation.
Test Your Eye: The Developer's Quiz
Would you convert this building?
The Local Test: Bank of Italy vs. Sobrato Tower
The study explicitly names two downtown San José buildings as examples. Bank of Italy (12 S 1st St) scores well: it's a 1926 structure with narrow floorplates, operable windows, and high ceilings—classic pre-war construction. Sobrato Tower (488 Almaden Blvd) is the opposite: a modern curtain-wall tower with deep center-core floorplates and low ceilings.
| Criteria | Bank of Italy (1926) | Sobrato Tower (1988) |
|---|---|---|
| Floorplate Depth | Shallow | Deep center-core |
| Ceiling Height | Pre-war high-ceiling construction | Post-1980s standard office |
| Windows | Punched, Operable | Curtain Wall, Fixed |
| Verdict | Good Candidate | Challenging Candidate |
The Financial Gap
Physical viability is necessary but not sufficient. The study identifies a persistent financial gap: office valuations haven't fallen enough to meet the residual land values that residential development can support.
Owners remain anchored to office-era valuations. Meanwhile, conversion costs are higher than many expect—selective demolition, full systems replacement, and extensive tenant improvement work often narrow the cost differential between conversion and ground-up development.
Office-to-residential conversions sit at the nexus of three realities: high vacancy rates, housing shortages, and maturing debt. The Mortgage Bankers Association estimated $92 billion in office loans matured in 2023 alone, with another $58 billion in 2024. Buildings that can't attract tenants face difficult choices—and conversion may be the least-bad option for some owners.
What Policy Can (and Can't) Do
The most effective policy levers reduce upfront cost or time rather than alter building form. The study identifies several high-leverage interventions:
- Fee relief: Temporarily reduce or defer impact and linkage fees; allow fees paid at certificate of occupancy rather than permit issuance.
- Parking flexibility: Reduce or eliminate parking minimums for conversion projects.
- Zoning adjustments: Allow residential by-right in office districts; expand density and height allowances.
- Process predictability: Ministerial or expedited review tracks reduce holding costs and increase lender confidence.
Calgary offers a useful case study. The city commissioned Gensler to assess its downtown office stock and established a Downtown Development Incentive Program providing CA$75 per square foot for conversions. The result: five projects under construction and ten more in development, increasing downtown residential units by 24%.
What Policy Can't Fix
Fundamental constraints—seismic requirements, life safety codes, accessibility standards, energy codes—are governed by state building codes and can't be modified locally. A deep-floorplate curtain-wall tower won't suddenly work because the city waives fees. Policy should focus on projects near the margin of feasibility, not buildings with insurmountable physical constraints.
Downtown San José: Conversions in Motion
Downtown San José isn't waiting for theory to prove out. With older office buildings still experiencing elevated vacancy levels years after the pandemic, developers and city leadership are treating residential conversion as a strategic solution to build more housing and further activate the downtown area. Three projects illustrate the range of what's possible.
Conversion is also only one route to a more residential downtown, and the others are on display blocks away: the same Westbank team behind the Bank of Italy bought The Fay, the stalled 23-story residential tower whose units the city now master-leases for workforce housing, and ground-up affordable construction continues with the 168 income-restricted homes approved next to The 88.
Bank of Italy Building: The Flagship Test Case
The Bank of Italy Building (12 South 1st Street) represents the most symbolically significant conversion in the region. This 13-story Mediterranean Revival landmark, completed in 1926, served as San José's tallest building for 60 years. After decades of underutilization, with many windows boarded-iup, Westbank and Urban Community acquired it in 2017 for $27 million with initial plans for boutique office renovation.
The pandemic catalyzed a strategic pivot. Construction is expected to began in early 2026, targeting over 100 apartments across floors 2-12 with luxury penthouses beneath the distinctive cupola. Architects RMW and Bjarke Ingels Group designed the conversion to leverage the building's smaller floor plates and individual office windows as ideal dimensions for residential units with natural light.
"This conversion is very important for the future of downtown San José," said Bob Staedler of Silicon Valley Synergy. "Having this important historic building activated will improve the vibrancy of the area. More of these conversions need to happen."
74-96 South First Street: The Smaller-Scale Historic Model
Just down the block, a different category of conversion is taking shape. Green Valley Enterprises (a Swenson family entity) proposed in September 2025 to convert the second and third floors of this 1892 Romanesque-style building into 47 apartments—32 studios and 15 one-bedrooms.
The project is strategically framed as historic restoration rather than new development. MCM Diversified noted in planning documents: "Since the building's original use when built in the 1890s was residential, this would restore the building's original use. This is essentially a tenant improvement on an existing building." The Romanesque structure, designed by prolific San José architects Jacob and Theodore Lenzen, served as the "Security Building" after Security State and Savings Bank occupied it in 1926—making the residential conversion a historical full circle.
The ground floor remains retail-focused, with established tenants like Elyse Restaurant anchoring street-level activation. This approach aligns with downtown's broader placemaking strategy: maintaining restaurant and retail vitality while adding residential density above.
CityView Plaza: The Largest Bay Area Conversion
Jay Paul Co.'s CityView Plaza redevelopment may be the most ambitious office-to-residential conversion in the Bay Area. The developer originally proposed three 19-story office towers with 3.4 million square feet—approved in 2020. When office demand collapsed, they pivoted.
The revised plan includes 680 residential units across two phases: "The Village at CityView" converts four existing office buildings into 320 apartments, while "The Tower at CityView" constructs a new 27-story luxury high-rise with 360 units. Demolition of parking structures was underway by August 2025.
Taking Local Leadership on Conversions
Across North America, cities are demonstrating that office-to-residential conversions can be a valuable tool for creating housing. Calgary established a CA$75 per square foot incentive program that has five projects under construction and ten more in development. New York City's zoning reforms have enabled landmark conversions like the Flatiron Building. Chicago, Denver, and Boston have all introduced conversion incentive programs targeting their own downtown office stock.
San José is taking its own local lead. By strategically adjusting affordable housing requirements for specific projects and reducing impact fees, the city has created conditions where residential conversion delivers viable returns compared to dormant office ownership. The goal: produce more housing, redevelop underutilized buildings, and activate downtown areas that have struggled since the pandemic.
These conversions serve multiple objectives simultaneously: addressing California's housing shortage, bringing new residents to support local retail and restaurants, and supporting downtown's evolution toward a mixed-use cultural hub where people live, work, and gather.
Key Takeaways
- Physical form is decisive. Only 25-30% of office buildings are physically suitable for conversion—typically pre-1960s structures or small mid-rises with narrow floorplates.
- The financial gap persists. Office valuations haven't declined enough to meet residential land values; conversion costs are higher than expected.
- Policy helps at the margin. Fee relief, parking flexibility, and expedited review matter for projects near feasibility—but can't fix bad fundamentals.
- Most vacant office won't convert. Downtown San José has ~20% vacancy, but the subset of well-suited buildings is narrow. Expect selective wins, not wholesale transformation.
Kostya.io